• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar

INDIAN RAILWAY NEWS

SPECIAL TRAINS,INDIAN RAILWAY NEWS,IRCTC RULES,SUMMER SPECIAL TRAINS,FESTIVAL SPECIAL TRAINS,CANCELLATION OF TRAINS, DIVERSION OF TRAINS, RESCHEDULED TRAINS

  • Disclaimer
You are here: Home / INDIAN RAILWAY NEWS / Hyderabad Metro Rail Latest Updates

Hyderabad Metro Rail Latest Updates

November 27, 2017 by indiaadmn456 Leave a Comment


Hyderabad Metro Rail Latest Updates

• An elevated Metro Rail, with 2 tracks (up and down lines) on a deck erected on pillars in the central median of the road, without obstructing the road traffic.

• Adequate parking space and circulating areas to be provided for multi modal commute

• The proposed rail will have a maximum speed of 80 kmph, the average speed of the trains will be around 34 kmph- an international standard for MRT systems.

The travel time by Metro Rail from one end to another will be as such:

• 45 minutes for Corridor 1 (Miyapur-L.B. Nagar – 29 KM) as against 1 hr 44 minutes by road.

• 22 minutes for Corridor 2 (Jubilee Bus Station-Falaknuma – 15 Km) as against 1 hr 10 minutes by road.

• 39 minutes for Corridor 3 (Nagole-Raidurg – 28 KM) as against 1 hr 26 minutes by road.

• Rails will of course be continuously welded in order to lessen the noise levels.

• Different categories of aesthetic stations are being designed to reflect the local architecture. As far as possible, parking and circulation areas will be developed on nearby government lands.

• Coaches will be air-conditioned with automatic door closures and many other safety features.

• Eco-friendly travel mode that will reduce air as well as noise pollution in the city terminals. Also station based junctions will be conducted with bus transport (bus rapid transit system) routes & smart card-based automatic ticketing systems.

Source: http://hmrl.telangana.gov.in



Filed Under: INDIAN RAILWAY NEWS Tagged With: INDIAN RAILWAY NEWS

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar





Search




Copyright © 2023 · Magazine Pro on Genesis Framework · WordPress · Log in