• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar

INDIAN RAILWAY NEWS

SPECIAL TRAINS,INDIAN RAILWAY NEWS,IRCTC RULES,SUMMER SPECIAL TRAINS,FESTIVAL SPECIAL TRAINS,CANCELLATION OF TRAINS, DIVERSION OF TRAINS, RESCHEDULED TRAINS

  • Disclaimer
You are here: Home / INDIAN RAILWAY NEWS / 09-3X Dynamic Tamping Express machines-Indian Railway

09-3X Dynamic Tamping Express machines-Indian Railway

April 6, 2018 by indiaadmn456 Leave a Comment


Indian Railways inducts New Machine 09-3x Dynamic Tamping Express for improved Mechanised Track Maintenance

This advanced technology simulator is presently only available in five countries including India.

Indian Railway has inducted three numbers of 09-3X Dynamic Tamping Express machines, the state of the art integrated track maintenance. These machines were inaugurated and flagged off by Shri M.K. Gupta, Member Engineering, Railway Board at Faridabad. Seven number of such machines are planned to be included within next six months in the present fleet of 874 track maintenance machines over IR for deployment on heavy density Routes.

The New 09-3X- Dynamic Tamping Express costing about Rs.27Cr each is a latest high output integrated tamping machine having multiple functions, so far being carried out by different machines. It can measure pre & post track geometry, correct the track to required geometry, can tamp three sleepers simultaneously, stabilize and measure post tamping track parameters under load to ensure quality of work done. This eliminates the need for a separate stabilisation machine which reduces operating costs and track possession time. This machine will vibrate & compact the loose stone ballast after tamping for safe movements of trains. These machines have been manufactured in India under MAKE IN INDIA initiative with imported components. 42 more such machines have been planned to be included in Indian Railway maintenance fleet over next three years. This will further improve the safety, reliability and economy in maintenance of tracks over Indian Railways. This will also eliminate manual measurement of track quality after maintenance.

Source: PIB



Filed Under: INDIAN RAILWAY NEWS Tagged With: INDIAN RAILWAY NEWS

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar





Search




Copyright © 2023 · Magazine Pro on Genesis Framework · WordPress · Log in