• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
  • Skip to secondary sidebar

INDIAN RAILWAY NEWS

SPECIAL TRAINS,INDIAN RAILWAY NEWS,IRCTC RULES,SUMMER SPECIAL TRAINS,FESTIVAL SPECIAL TRAINS,CANCELLATION OF TRAINS, DIVERSION OF TRAINS, RESCHEDULED TRAINS

  • Disclaimer
You are here: Home / INDIAN RAILWAY NEWS / SAIL steel for Bogibeel Bridge

SAIL steel for Bogibeel Bridge

December 25, 2018 by indiaadmn456 Leave a Comment


Ministry of Steel

SAIL steel for Bogibeel Bridge

Steel Authority of India Limited (SAIL) has supplied around 35400 metric tonnes of steel for the construction of Bogibeel Road-cum-Rail Bridge on the river Brahmaputra. This quantity is little more than 50% of the total quantity of steel supplied for the bridge.

SAIL has also supplied TMT rebars, plates and structural for this 4.94 KM long bridge,which has composite welded steel truss girders in its structures. Earlier, SAIL had supplied 90% steel for the construction of the Dhola-Sadiyabridge, which is India’s longest bridge.

The 4.9 km-long bridge on the Brahmaputra river is Asia’s second longest rail-cum-road bridge. It has a serviceable period of 120 years.



Filed Under: INDIAN RAILWAY NEWS Tagged With: INDIAN RAILWAY NEWS

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar





Search




Secondary Sidebar

Copyright © 2023 · Magazine Pro on Genesis Framework · WordPress · Log in