TRAFFIC BLOCKS TO CARRYOUT ENGINEERING WORKS BETWEEN BHIGVAN AND WADSINGE on SOLAPUR DIVISION Solapur Division will operate traffic blocks of 2 hrs (10.10 hrs to 12.10 hrs) from 3.12.2018 to 1.1.2019 (30 days) between Bhigvan and Wadsinge single line section to carry out engineering works. Due to these blocks the train running pattern will be as under- Trains Cancelled … [Read more...] about TRAFFIC BLOCKS TO CARRYOUT ENGINEERING WORKS BETWEEN BHIGVAN AND WADSINGE on SOLAPUR DIVISION
